PERANCANGAN INTERVAL PERAWATAN MESIN SECARA PREVENTIVE MAINTENANCE DENGAN METODE RELIABILITY CENTERED MAINTENANCE II ( RCM II) STUDI KASUS : PT. GUNUNG SELAMAT LESTARI
DOSEN PEMBIMBING | PARIS JOHANNES GINTING, S.T., M.T. |
---|---|
MAHASISWA | ROGANDA SIMBOLON, DOARJO SIMBOLON |
ABSTRAK | ABSTRAK.pdf |
DAFTAR ISI | DAFTAR_ISI.pdf |
BAB 1 | BAB_I.pdf |